Click to HomeGovernmentResidentsBusinessHow Do I...

Go To Search
Utilities Wastewater Projects

Forest Hills Pump Station and Force Main
Project Number: 06-046.00
Completed

Installation of two pump stations and piping to divert flows away from Holiday RV Park within the Forest Hills area of the County.

For questions concerning this project, please contact .

 
 Forest Hills Pump Stations and Sewer Improvements
Project Number: 06-046.01
Construction Phase

Construction of sanitary pump station at Sunrise Viallas on Bartelt Road and associated sewer piping down Bartelt Road from the entrance into Winn Dixie shopping center to Knollwood Drive. A secondary pump station and associated sewer piping will be installed at Panorama Avenue at US Highway 19.
 
For questions concerning this project, please contact .

 
Northwood Wastewater Master Pump Station
Project Number: 06-051.00
Design Phase

Construction of a new master pump station to remove two existing pump stations and rehabilitate a third pump station at a bank parking lot at the corner of CR 581 and Williamsburg Drive.
 
For questions concerning this project, please contact .

 
Wesley Chapel Utility Improvement (Cowpath Pump Station)
Project Number: 06-052.00
Close Out

Upgrade the existing Cow Path pump station to an in-line booster station and install additional force main piping which will provide adequate flows to the Wesley Chapel area.

For questions concerning this project, please contact .

 
Power Line Corridor 36" Force Main
Project Number: 07-022.00
Construction Phase

Design and construct a 36" Force Main inside the Powerline Corridor to the Shady Hills Wastewater Treatment Plant as part of the Deer Park Wastewater Treatment Plant diversion.

For questions concerning this project, please contact .

 
Timber Greens Master Pump Station 
Project Number: 07-023.00
Construction Phase

Design and construction of a master pump station to accept flows from the New Port Richey area and the west area from Madison to Trouble Creek to one mile north and the area around Timber Greens. The booster station will transmit the flows to the Shady Hills Wastewater Treatment Plant.

For questions concerning this project, please contact .

 
Moon Lake Road 24" Force Main
Project Number: 08-036.00
Construction Phase


Design and construction of a 36" Force Main along the proposed Ridge Road Extension to the Powerline Corridor as part of the Deer Park Wastewater Treatment Plant diversion.

For questions concerning this project, please contact .

 
Deer Park Master Pump Station
Project Number: 10-009.00
Construction Phase

Design and construction of a master pump station to service the area currently being serviced by the Deer Park Wastewater Treatment Plant. Approximately 7 to 10 smaller pump stations will pump to this master pump station and it will transfer the flow to the main pipe line in River Crossing area to the new Timber Greens master pump station.

For questions concerning this project, please contact .

 
Shady Hills Sludge Belt Filter Presses
Project Number: 11-022.00
Completed

Refurbishment of the two existing belt filter presses (BFP), installation of two new belt filter presses with Polymer systems, cake pump and all piping and valves to make a completed workable systems as designed at the Shady Hills Wastewater Treatment Plant. (aka Biosolids Handling Conversion Project)

For questions concerning this project, please contact .

 
Cypress Manor WWTP Permit Renewal
Project Number: 12-020.00
Permitting Phase

Cypress Manor Wastewater Treatment Plant Operating Permit Renewal

For questions concerning this project, please contact .
           
 
 North Central Booster Pump Station
Project Number: 13-022.00
Procurement Phase

Design, build, and operate a new Booster Pump Station to serve the north central region of Pasco County Utilities. An added 1 MGD will be redirected to the Shady Hills WWTP from the flows to the Land O' Lakes WWTP. This project will incorporate the newly installed 12" and 14" force main that runs from the Shady Hills WWTP along the power corridor, south along US 41, and them onto Central Avenue. 

For questions concerning this project, please contact .
 
Land O' Lakes Disc Filters Installation
Project Number: 13-024.00
Procurement Phase

Contractor shall relocate & install four (4) disc filter systems at the Land O' Lakes (LOL) Wastewater Treatment Plant (WWTP)

For questions concerning this project, please contact .
 
Wesley Center WWTP Rehabilitation and Expansion
Project Number: 14-005.00
Scoping Phase

Engineering evaluation and construction services for the Wesley Center Wastewater Treatment Plant (WWTP) to identify the necessary upgrades and improvements to correct various deficiencies due to corrosion problems, aging of the facility and to increase it's capacity.  

For questions concerning this project, please contact utilcustserv@pascocountyfl.
 
 Embassy Hills Additional RRIBS
Project Number: 14-016.00
Design Phase

Construction of 4 additional RRIBS at the Embassy Hills site that have been permitted by FDEP adding more disposal capability and flexibility to the PCMRS.

For questions concerning this project, please contact utilcustserv@pascocountyfl.