DEVELOPMENT REVIEW COMMITTEE, PASCO COUNTY, FLORIDA
A G E N D A
DECEMBER 5, 2002
1:30 p.m. - Historic Pasco County Courthouse, Board Room, 2nd Floor,
37918 Meridian Avenue, Dade City, FL 33525
DEVELOPMENT REVIEW COMMITTEE
John J. Gallagher
County Administrator
Michael Nurrenbrock
OMB Director
Douglas S. Bramlett
Assistant County Administrator
(Utilities Services)
Daniel R. Johnson
Assistant County Administrator
(Public Services)
Bipin Parikh, P.E.
Assistant County Administrator
(Development Services)
LEGAL COUNSEL
Robert D. Sumner
County Attorney
ADVISORY STAFF
Cynthia M. Jolly, P.E.
Development Director
Debra M. Zampetti
Zoning/Code Compliance
Administrator
Ronald G. Lewis, P.E.
Development Review Manager
Samuel P. Steffey II
Growth Management Administrator
James C. Widman, P.E.
Engineering Services Director
Representative of the Clerk
of the Circuit Court
I.
OPENING
II.
ROLL CALL
III.
MINUTES
August 8, 2002
Pages: 1-30
October 3, 2002
Pages: 1-23
IV.
VARIANCE PETITIONS
A.
Public Hearing
Proof of Publication
B.
Variance Review
The Development Review Committee may grant a variance from the terms of the Land Development Code when such variance will not be contrary to the public interest; where, owing to special conditions, a literal enforcement of the provisions of this code would result in unnecessary hardship or where improved or alternative technology would meet or exceed the development and construction standards set forth in this code. Such variance shall not be granted if it has the effect of nullifying the intent and purpose of this code. Furthermore, such variance shall not be granted by the Development Review Committee unless and until a variance application is submitted demonstrating compliance with one or more of the following:
1.
That special conditions and circumstances exist which are peculiar to the land, structures, or required subdivision improvements involved, and which are not applicable to other lands, structures, or required improvements.
2.
That a literal interpretation of the provisions of this code would deprive the applicant of rights commonly enjoyed by other properties with similar conditions.
3.
That the actions of the applicant did not cause the special conditions and circumstances which necessitate the variance.
4.
That the granting of the variance requested will not confer on the applicant any special privilege that is denied by this code to other lands, structures, or required improvements under similar conditions.
5.
Through improved or alternative technology, the development and construction standards set forth in this code are met or exceeded.
6.
The Development Review Committee finds that the requirements of this code have been met based upon the review and findings of the Development Review Services Department and information presented at a public hearing.
7.
The Development Review Committee further finds that the reasons set forth in the application justify the granting of the variance that would make possible the reasonable use of the land, buildings, or other improvements.
8.
The Development Review Committee finds that the granting of the variance would be in harmony with the general standards, purpose, and intent of this code and will not be injurious to the surrounding territory, or otherwise be detrimental to the public welfare.
9.
The Development Review Committee finds that the granting of the variance would not violate the Goals, Objectives, and Policies of the Comprehensive Plan.
a.
Memorandum No.:
DR03-076
Project Name:
Marinelli and Mertins Variance (VAC02-017)
Commissioner
The Honorable Pat Mulieri, Ed.D.
Applicant:
Frank Marinelli and Warren Mertins
Location:
South side of S.R. 54, approximately four-tenths mile east of Oak Grove Drive, Section 33, Township 26 South, Range 19 East.
Acreage:
0.96 Acre
Requested:
A variance from Sections 8 and 10 of Ordinance No. 02-04, Landscaping and Irrigation.
RECOMMENDATION:
Approval with added conditions.
b.
Memorandum No.:
DR03-297
Project Name:
Meadow Pointe III, Parcels FF and OO
Commissioner:
The Honorable Pat Mulieri, Ed.D.
Applicant:
Meadow Pointe Partners
Location:
On the east side of the proposed Meadow Pointe Boulevard, approximately 3,300 feet north of Strickland Road, Section 34, Township 26 South, Range 20 East.
Acreage:
83.973 Acres, m.o.l.
Requested:
A variance from the Land Development Code, Section 602.7.C, Type I Permit; Subsection 1, Required Minimum; Subsection 2, Credits Against Required Minimum; and Subsection 4, Percentage of Trees in Common Areas.
RECOMMENDATION:
Approval with conditions.
V.
APPEALS
A.
Class I
None Scheduled
B.
Class II
None Scheduled
C.
Class III
None Scheduled
D.
Class IV
None Scheduled
E.
Consistency
None Scheduled
VI.
PUBLIC NOTICE AGENDA
A.
Proof of Public Notice
B.
Class II
1.
Memorandum No.:
DR03-290
Project Name:
Cypress Creek DRI, Phase 1, Infrastructure
(Continued from the November 21, 2002, Development Review Committee Meeting)
Commissioner:
The Honorable Pat Mulieri, Ed.D.
Location:
On the southeast corner of the intersection of S.R. 56 and I-75, Section 26, Township 26 South, Range 19 East.
Acreage:
147.63 Acres, m.o.l.
Proposed Development:
To regrade the site and install infrastructure.
RECOMMENDATION:
Approval with conditions.
2.
Memorandum No.:
DR03-291
Project Name:
Leeds S.R. 39, Phase 1
Commissioner:
The Honorable Ted Schrader
Location:
On the west side of S.R. 39 and on the north side of Fig Road, Section 25, Township 26 South, Range 21 East.
Acreage:
8.07 Acres, m.o.l.
Proposed Development:
To construct a 10,282-square-foot building expansion and a loading dock.
RECOMMENDATION:
Approval with conditions.
3.
Memorandum No.:
DR03-292
Project Name:
Rt. 41 Manufacturing Truss Plant
(Continued from the October 17, 2002, Development Review Committee Meeting)
Commissioner:
The Honorable Pat Mulieri, Ed.D.
Location:
On the east side of U.S. 41, approximately 100 feet southeast of Greenfield Road, Section 33, Township 24 South, Range 18 East.
Acreage:
9.85 Acres, m.o.l.
Proposed Development:
To construct a 25,200-square-foot truss manufacturing plant.
RECOMMENDATION:
Approval with conditions.
C.
Class III
1.
Memorandum No.:
DR03-298
Project Name:
Meadow Pointe III, Parcels FF and OO
Commissioner:
The Honorable Pat Mulieri, Ed.D.
Location:
On the east side of the proposed Meadow Pointe Boulevard, approximately 3,300 feet north of Strickland Road, Section 34, Township 26 South, Range 20 East.
Acreage:
83.973 Acres, m.o.l.
Proposed Development:
The developer is requesting preliminary plan approval for the division of 83.973 acres into 133 single-family lots.
RECOMMENDATION:
Approval with conditions.
2.
Memorandum No.:
DR03-305
Project Name:
Sabal at Wyndtree
(Continued from the October 3, 2002; November 7, 2002; and November 21, 2002; Development Review Committee Meetings)
Commissioner:
The Honorable Ann Hildebrand
Location:
On the north side of Mitchell Boulevard directly across from Davenport Drive, approximately one-half mile east of the intersection of Mitchell Boulevard and Seven Springs Boulevard, Section 34, Township 26 South, Range 16 East.
Acreage:
19.57 Acres, m.o.l.
Proposed Development:
The developer is requesting preliminary and construction plan approval and Stormwater Management Plan and Report approval to divide 19.57 acres into 61 single-family lots.
RECOMMENDATION:
Approval with conditions.
VII.
REGULAR AGENDA
A.
Class II
None Scheduled
B.
Class III
1.
Memorandum No.:
GM03-129
Project Name:
Long Lake Ranch Future Land Use Element Map Change
Commissioner:
The Honorable Steve Simon
Location:
South side of S.R. 54, approximately 1« miles west of U.S. 41 and 1« miles east of the Suncoast Parkway, Sections 27 and 28, Township 26 South, Range 18 East.
Acreage:
329.9 Acres
Proposed Development:
Change of land use from RES-3 (Residential - 3 du/ga) to ROR (Retail/Office/Residential).
RECOMMENDATION:
Approval of the change to the Future Land Use Map to the Local Planning Agency.
C.
Class IV
None Scheduled
D.
Utilities
None Scheduled
VIII.
CONSISTENCY DETERMINATIONS
None Scheduled
IX.
DISCUSSION
A.
Discussion of Policy Issues
None Scheduled
X.
INFORMATION
None Scheduled
XI.
NOTED ITEMS
A.
Class I Development Actions
None Scheduled
B.
Class IIIE Development Actions
None Scheduled
C.
Class IIIR Development Actions
None Scheduled